Schedule grouped jobs on parallel machines with single mold constraint (Q2725354)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Schedule grouped jobs on parallel machines with single mold constraint |
scientific article; zbMATH DE number 1619167
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Schedule grouped jobs on parallel machines with single mold constraint |
scientific article; zbMATH DE number 1619167 |
Statements
7 August 2002
0 references
production scheduling
0 references
parallel machine
0 references
group technology
0 references
Schedule grouped jobs on parallel machines with single mold constraint (English)
0 references