Optimal two- and three-stage production schedules with set-up time included (Q2834736)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Optimal two- and three-stage production schedules with set-up time included |
scientific article; zbMATH DE number 6655537
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Optimal two- and three-stage production schedules with set-up time included |
scientific article; zbMATH DE number 6655537 |
Statements
23 November 2016
0 references
Optimal two- and three-stage production schedules with set-up time included (English)
0 references