Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem (Q309064)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem |
scientific article; zbMATH DE number 6624265
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem |
scientific article; zbMATH DE number 6624265 |
Statements
Configuration and the advantages of the shifting bottleneck procedure for optimizing the job shop total weighted tardiness scheduling problem (English)
0 references
7 September 2016
0 references
job shop
0 references
shifting bottleneck
0 references
total weighted tardiness
0 references
production scheduling
0 references
0 references
0 references
0 references
0 references