A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation (Q3146162)
From MaRDI portal
scientific article
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation |
scientific article |
Statements
A Simulation-based Production Scheduling Method for Minimizing the Due-date-deviation (English)
0 references
4 November 2002
0 references
jop-shp scheduling
0 references
simulation
0 references
due-date-deviation
0 references
parameter space
0 references
backward simulation
0 references
backward/forward hybrid simulation
0 references