Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
One- and two-stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rate - MaRDI portal

One- and two-stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rate (Q3315253)

From MaRDI portal
scientific article
Language Label Description Also known as
English
One- and two-stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rate
scientific article

    Statements

    One- and two-stage scheduling of two products with distributed inserted idle time: The benefits of a controllable production rate (English)
    0 references
    0 references
    0 references
    1983
    0 references
    controllable production rate
    0 references
    constant demand
    0 references
    scheduling two products on a single machine
    0 references
    two machines in series
    0 references
    changeover cost
    0 references
    idle time
    0 references

    Identifiers