Minimizing the total completion time in a distributed two stage assembly system with setup times (Q337027)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Minimizing the total completion time in a distributed two stage assembly system with setup times |
scientific article; zbMATH DE number 6650667
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Minimizing the total completion time in a distributed two stage assembly system with setup times |
scientific article; zbMATH DE number 6650667 |
Statements
Minimizing the total completion time in a distributed two stage assembly system with setup times (English)
0 references
10 November 2016
0 references
scheduling
0 references
distributed two-stage assembly flowshop
0 references
hybrid meta-heuristics
0 references
total completion time
0 references
0 references
0 references
0 references
0 references
0 references