Scheduling linearly deteriorating jobs by two agents to minimize the weighted sum of two criteria (Q337198)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling linearly deteriorating jobs by two agents to minimize the weighted sum of two criteria |
scientific article; zbMATH DE number 6650737
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling linearly deteriorating jobs by two agents to minimize the weighted sum of two criteria |
scientific article; zbMATH DE number 6650737 |
Statements
Scheduling linearly deteriorating jobs by two agents to minimize the weighted sum of two criteria (English)
0 references
10 November 2016
0 references
agent scheduling
0 references
deteriorating jobs
0 references
total weighted completion time
0 references
maximum lateness
0 references
NP-hardness
0 references
algorithms
0 references