EQUIPMENT REPLACEMENT WITH CONSIDERATION OF TECHNOLOGICAL ADVANCES : DETERMINATION OF REPLACEMENT TIMES BY CONTROL LIMIT POLICY (Q3806964)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: EQUIPMENT REPLACEMENT WITH CONSIDERATION OF TECHNOLOGICAL ADVANCES : DETERMINATION OF REPLACEMENT TIMES BY CONTROL LIMIT POLICY |
scientific article
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | EQUIPMENT REPLACEMENT WITH CONSIDERATION OF TECHNOLOGICAL ADVANCES : DETERMINATION OF REPLACEMENT TIMES BY CONTROL LIMIT POLICY |
scientific article |
Statements
EQUIPMENT REPLACEMENT WITH CONSIDERATION OF TECHNOLOGICAL ADVANCES : DETERMINATION OF REPLACEMENT TIMES BY CONTROL LIMIT POLICY (English)
0 references
1988
0 references
effective replacement decision system in management
0 references
finite planning horizon
0 references
Control Limit Policy
0 references
optimal policy
0 references