Modelling and solving for ready-mixed concrete scheduling problems with time dependence (Q391727)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Modelling and solving for ready-mixed concrete scheduling problems with time dependence |
scientific article; zbMATH DE number 6244422
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Modelling and solving for ready-mixed concrete scheduling problems with time dependence |
scientific article; zbMATH DE number 6244422 |
Statements
Modelling and solving for ready-mixed concrete scheduling problems with time dependence (English)
0 references
10 January 2014
0 references
Summary: In this paper, we present a formulation for the ready-mixed concrete scheduling problems with time-dependent travel time. Traffic congestion is a major problem for the business of delivering RMC. It may lead to late deliveries of RMC to construction sites, and because RMC is perishable, late deliveries also mean large additional costs for both batch plants and the construction companies. Additional costs caused by traffic congestion can be reduced by taking predictable traffic congestion into account in the process of scheduling. For this purpose we develop a model with consideration of traffic congestion of RMC which uses a heuristic approach based on local search algorithm to solve. A detailed case study based on industrial data is used to illustrate the potential of the proposed approach.
0 references
ready-mixed concrete
0 references
RMC
0 references
traffic congestion
0 references
local search algorithm
0 references
heuristics approach
0 references