Two-Stage Flowshop Scheduling Problem with Bicriteria (Q4022255)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-Stage Flowshop Scheduling Problem with Bicriteria |
scientific article
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two-Stage Flowshop Scheduling Problem with Bicriteria |
scientific article |
Statements
Two-Stage Flowshop Scheduling Problem with Bicriteria (English)
0 references
17 January 1993
0 references
two-state flowshop scheduling
0 references
optimal makespan
0 references
branch-and-bound
0 references
heuristic
0 references