Scheduling on same-speed processors with at most one downtime on each machine (Q429662)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling on same-speed processors with at most one downtime on each machine |
scientific article; zbMATH DE number 6048240
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling on same-speed processors with at most one downtime on each machine |
scientific article; zbMATH DE number 6048240 |
Statements
Scheduling on same-speed processors with at most one downtime on each machine (English)
0 references
20 June 2012
0 references
multiprocessor scheduling
0 references
LPT
0 references
downtimes
0 references
fixed jobs
0 references
worst-case bounds
0 references
makespan
0 references
machine shutdowns
0 references
availability constraints
0 references
0 references
0 references