A simulation using a hybrid method for predicting fault zones ahead of a tunnel face (Q4417039)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A simulation using a hybrid method for predicting fault zones ahead of a tunnel face |
scientific article; zbMATH DE number 1959974
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A simulation using a hybrid method for predicting fault zones ahead of a tunnel face |
scientific article; zbMATH DE number 1959974 |
Statements
A simulation using a hybrid method for predicting fault zones ahead of a tunnel face (English)
0 references
6 August 2003
0 references
hybrid model
0 references
three-dimensional monitoring
0 references
fault zone
0 references
tunnel face
0 references
arching effect
0 references
0.6866797208786011
0 references
0.6744760870933533
0 references
0.670549213886261
0 references