Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties (Q454994)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties |
scientific article; zbMATH DE number 6089800
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties |
scientific article; zbMATH DE number 6089800 |
Statements
Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties (English)
0 references
2 October 2012
0 references
scheduling
0 references
single-machine
0 references
two agents
0 references
deterioration
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references