Group scheduling in a two-stage flowshop (Q4656762)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Group scheduling in a two-stage flowshop |
scientific article; zbMATH DE number 2144486
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Group scheduling in a two-stage flowshop |
scientific article; zbMATH DE number 2144486 |
Statements
Group scheduling in a two-stage flowshop (English)
0 references
14 March 2005
0 references
group scheduling
0 references
family set-up
0 references
makespan minimisation
0 references
branch-and-bound algorithm
0 references
0.93311554
0 references
0.9066669
0 references
0.90163046
0 references
0.89075375
0 references
0 references
0.8886937
0 references
0 references
0.8861239
0 references
0.8860805
0 references