Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics (Q4679992)
From MaRDI portal
scientific article; zbMATH DE number 2172585
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics |
scientific article; zbMATH DE number 2172585 |
Statements
Resource-constrained project scheduling: An evaluation of adaptive control schemes for parameterized sampling heuristics (English)
0 references
31 May 2005
0 references