Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns (Q4849306)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns |
scientific article; zbMATH DE number 800671
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns |
scientific article; zbMATH DE number 800671 |
Statements
Two-Stage Production Scheduling with Separated Set-up Times and Stochastic Breakdowns (English)
0 references
9 November 1995
0 references
two-machine flowshop
0 references
set-up times
0 references
makespan
0 references
random breakdown
0 references