Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Semi-on-line multiprocessor scheduling with given total processing time - MaRDI portal

Semi-on-line multiprocessor scheduling with given total processing time (Q557814)

From MaRDI portal





scientific article; zbMATH DE number 2184050
Language Label Description Also known as
English
Semi-on-line multiprocessor scheduling with given total processing time
scientific article; zbMATH DE number 2184050

    Statements

    Semi-on-line multiprocessor scheduling with given total processing time (English)
    0 references
    0 references
    0 references
    0 references
    30 June 2005
    0 references
    In the paper, a classical multiprocessor scheduling problem is considered. A set of independent jobs is to be processed on \(m\) parallel, identical machines in order to minimize the makespan. The jobs arrive on-line, i.e., each job must be immediately assigned to one of the machines. A modification assumed in the paper is the knowledge of a sum of processing times of tasks which are supposed to arrive. The authors propose a new approximation algorithm with performance ratio 1.6.
    0 references
    on-line algorithms
    0 references
    multiprocessor scheduling
    0 references
    approximation algorithms
    0 references

    Identifiers