Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Single machine scheduling with assignable due dates to minimize maximum and total late work - MaRDI portal

Single machine scheduling with assignable due dates to minimize maximum and total late work (Q6167395)

From MaRDI portal
scientific article; zbMATH DE number 7709096
Language Label Description Also known as
English
Single machine scheduling with assignable due dates to minimize maximum and total late work
scientific article; zbMATH DE number 7709096

    Statements

    Single machine scheduling with assignable due dates to minimize maximum and total late work (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    10 July 2023
    0 references
    scheduling
    0 references
    single machine
    0 references
    late work
    0 references
    assignable due dates
    0 references
    FPTAS
    0 references

    Identifiers