Grid-Aware On-Route Fast-Charging Infrastructure Planning for Battery Electric Bus with Equity Considerations: A Case Study in South King County (Q6451063)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Grid-Aware On-Route Fast-Charging Infrastructure Planning for Battery Electric Bus with Equity Considerations: A Case Study in South King County |
preprint article from arXiv
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Grid-Aware On-Route Fast-Charging Infrastructure Planning for Battery Electric Bus with Equity Considerations: A Case Study in South King County |
preprint article from arXiv |
Statements
14 September 2023
0 references
eess.SY
0 references
cs.SY
0 references
math.OC
0 references
Xinyi Zhao
0 references
Chaoyue Zhao
0 references
Grace Jia
0 references