Asynchronous time dependent switched model predictive control for nonlinear systems considering feasibility constraints (Q6664707)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Asynchronous time dependent switched model predictive control for nonlinear systems considering feasibility constraints |
scientific article; zbMATH DE number 7968560
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Asynchronous time dependent switched model predictive control for nonlinear systems considering feasibility constraints |
scientific article; zbMATH DE number 7968560 |
Statements
Asynchronous time dependent switched model predictive control for nonlinear systems considering feasibility constraints (English)
0 references
16 January 2025
0 references
asynchronous switching
0 references
\(\mathrm{H}_\infty\) performance
0 references
Lipschitz non-linear switched system
0 references
model predictive control
0 references
recursive feasibility
0 references
region of feasibility
0 references
0 references
0 references
0 references
0 references
0 references