An efficient second-order predictor-corrector infeasible primal-dual IPM algorithm with large iteration path updates for solving well-known SDO problems (Q6664882)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: An efficient second-order predictor-corrector infeasible primal-dual IPM algorithm with large iteration path updates for solving well-known SDO problems |
scientific article; zbMATH DE number 7968690
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | An efficient second-order predictor-corrector infeasible primal-dual IPM algorithm with large iteration path updates for solving well-known SDO problems |
scientific article; zbMATH DE number 7968690 |
Statements
An efficient second-order predictor-corrector infeasible primal-dual IPM algorithm with large iteration path updates for solving well-known SDO problems (English)
0 references
16 January 2025
0 references
infeasible interior-point method
0 references
second-order corrector method
0 references
large neighborhood
0 references
polynomial complexity
0 references
semidefinite optimization
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references