Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Shortest path to nonpreemptive schedules of unit-time jobs on two identical parallel machines with minimum total completion time - MaRDI portal

Shortest path to nonpreemptive schedules of unit-time jobs on two identical parallel machines with minimum total completion time (Q706379)

From MaRDI portal





scientific article; zbMATH DE number 2132321
Language Label Description Also known as
English
Shortest path to nonpreemptive schedules of unit-time jobs on two identical parallel machines with minimum total completion time
scientific article; zbMATH DE number 2132321

    Statements

    Shortest path to nonpreemptive schedules of unit-time jobs on two identical parallel machines with minimum total completion time (English)
    0 references
    0 references
    0 references
    8 February 2005
    0 references
    In this paper two-machine scheduling problems with unit processing times, release dates, precedence constraints and minimum total completion time are studied. More specifically, it is shown that problems \(P2| prec,r_j,p_j=1| \sum C_j\) and \(F2| prec,r_j,p_j=1| \sum C_j\) are polynomially solvable by reducing them to shortest path problems. Furthermore, the concept of ideal schedules (minimizing the makespan and total completion time simultaneously) is discusssed.
    0 references
    0 references
    scheduling
    0 references
    complexity
    0 references
    parallel machines
    0 references
    flow shop
    0 references
    ideal schedule
    0 references

    Identifiers