Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times - MaRDI portal

Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times (Q706971)

From MaRDI portal





scientific article; zbMATH DE number 2132680
Language Label Description Also known as
English
Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times
scientific article; zbMATH DE number 2132680

    Statements

    Three-stage flow-shop scheduling with assembly operations to minimize the weighted sum of product completion times (English)
    0 references
    0 references
    0 references
    9 February 2005
    0 references
    Scheduling
    0 references
    Branch and bound
    0 references
    Flow-shop
    0 references
    Machining operation
    0 references
    Assembly operation
    0 references

    Identifiers