A note on time/cost tradeoff curve generation for project scheduling with multi-mode resource availability costs (Q840615)

From MaRDI portal





scientific article; zbMATH DE number 5603408
Language Label Description Also known as
English
A note on time/cost tradeoff curve generation for project scheduling with multi-mode resource availability costs
scientific article; zbMATH DE number 5603408

    Statements

    A note on time/cost tradeoff curve generation for project scheduling with multi-mode resource availability costs (English)
    0 references
    0 references
    0 references
    13 September 2009
    0 references
    Summary: In this note we combine two known algorithms and show how they can be used in order to generate tradeoff curves between time and cost for deterministic project scheduling problems with multiple modes and resource availability costs. The approach can handle linear and non-linear non-decreasing cost functions and it is based on the exact algorithm presented in Demeulemeester (1995) for the resource availability cost problem without multiple modes. As the problem is NP-hard, the method is computationally viable to solve only problems of a moderate size. The performance of the combined algorithm is compared to solutions generated by GAMS/CPLEX.
    0 references
    project scheduling
    0 references
    resource availability cost
    0 references
    multiple modes
    0 references
    time/cost tradeoff curves
    0 references
    exact algorithm
    0 references
    0 references
    0 references

    Identifiers