Deprecated: $wgMWOAuthSharedUserIDs=false is deprecated, set $wgMWOAuthSharedUserIDs=true, $wgMWOAuthSharedUserSource='local' instead [Called from MediaWiki\HookContainer\HookContainer::run in /var/www/html/w/includes/HookContainer/HookContainer.php at line 135] in /var/www/html/w/includes/Debug/MWDebug.php on line 372
Minimizing total completion time in a two-machine flow shop with deteriorating jobs - MaRDI portal

Minimizing total completion time in a two-machine flow shop with deteriorating jobs (Q850246)

From MaRDI portal





scientific article; zbMATH DE number 5072704
Language Label Description Also known as
English
Minimizing total completion time in a two-machine flow shop with deteriorating jobs
scientific article; zbMATH DE number 5072704

    Statements

    Minimizing total completion time in a two-machine flow shop with deteriorating jobs (English)
    0 references
    0 references
    0 references
    0 references
    0 references
    15 November 2006
    0 references
    In the paper two-machine flow-shop scheduling problems with deteriorating jobs are studied where the processing time of a job is given by an increasing linear deterioration function depending on its starting time. The objective is to find a schedule minimizing the total completion time. At first, the authors study some polynomially solvable special cases of the problem and derive some dominance properties and two lower bounds. Afterwards, a heuristic and a branch-and-bound algorithm are proposed and compared in computational experiments.
    0 references
    0 references
    scheduling
    0 references
    flow-shop
    0 references
    simple linear deterioration
    0 references
    total completion time
    0 references
    0 references