Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (Q864823)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case |
scientific article; zbMATH DE number 5125258
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case |
scientific article; zbMATH DE number 5125258 |
Statements
Two metaheuristic methods for the common cycle economic lot sizing and scheduling in flexible flow shops with limited intermediate buffers: the finite horizon case (English)
0 references
13 February 2007
0 references
flexible flow line
0 references
lot scheduling
0 references
metaheuristics
0 references
finite horizon
0 references
limited intermediate buffers
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references
0 references