Scheduling parallel jobs to minimize the makespan (Q880560)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling parallel jobs to minimize the makespan |
scientific article; zbMATH DE number 5153374
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling parallel jobs to minimize the makespan |
scientific article; zbMATH DE number 5153374 |
Statements
Scheduling parallel jobs to minimize the makespan (English)
0 references
15 May 2007
0 references
multiprocessor scheduling
0 references
parallel jobs
0 references
approximation algorithms
0 references
online algorithms
0 references
list scheduling
0 references
release dates
0 references
0 references
0 references
0.91529846
0 references
0.91399527
0 references
0.9116559
0 references
0.90742576
0 references
0 references