Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication (Q880579)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication |
scientific article; zbMATH DE number 5153385
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication |
scientific article; zbMATH DE number 5153385 |
Statements
Hybrid decomposition heuristics for solving large-scale scheduling problems in semiconductor wafer fabrication (English)
0 references
15 May 2007
0 references
Job shop scheduling
0 references
Maximum lateness
0 references
Shifting bottleneck
0 references
Computational evaluation
0 references
0 references
0 references
0 references
0 references
0 references