Scheduling batches on parallel machines with major and minor set-ups (Q918855)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Scheduling batches on parallel machines with major and minor set-ups |
scientific article; zbMATH DE number 4160454
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Scheduling batches on parallel machines with major and minor set-ups |
scientific article; zbMATH DE number 4160454 |
Statements
Scheduling batches on parallel machines with major and minor set-ups (English)
0 references
1990
0 references
An interesting scheduling problem to minimize makespan on identical parallel machines is considered with major set-up times between different families of parts, and minor set-up times between different part types. A two-level heuristic is proposed based on the Multifit Method, where the first level assigns families to machines, and the second level determines the batch size. A tight lower bound on the makespan is derived and used to evaluate the effectiveness of the algorithm. Computational experiments prove that near-optimal schedules are generated.
0 references
makespan
0 references
identical parallel machines
0 references
set-up times
0 references
two-level heuristic
0 references
Multifit Method
0 references
near-optimal schedules
0 references