Two machine flow shop scheduling problem with weighted WIP costs (Q954049)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: Two machine flow shop scheduling problem with weighted WIP costs |
scientific article; zbMATH DE number 5363313
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | Two machine flow shop scheduling problem with weighted WIP costs |
scientific article; zbMATH DE number 5363313 |
Statements
Two machine flow shop scheduling problem with weighted WIP costs (English)
0 references
7 November 2008
0 references
WIP cost
0 references
two machine flow shop
0 references
computational complexity
0 references
heuristic analysis
0 references
0 references
0 references