A heuristic for scheduling general job shops to minimize maximum lateness (Q969764)
From MaRDI portal
| This is the item page for this Wikibase entity, intended for internal use and editing purposes. Please use this page instead for the normal view: A heuristic for scheduling general job shops to minimize maximum lateness |
scientific article; zbMATH DE number 5705628
| Language | Label | Description | Also known as |
|---|---|---|---|
| English | A heuristic for scheduling general job shops to minimize maximum lateness |
scientific article; zbMATH DE number 5705628 |
Statements
A heuristic for scheduling general job shops to minimize maximum lateness (English)
0 references
8 May 2010
0 references
0.90909564
0 references
0.9014723
0 references
0.9001175
0 references
0 references
0.89619297
0 references
0.8903153
0 references
0.89020103
0 references
0.88747215
0 references