| Publication | Date of Publication | Type |
|---|
| https://portal.mardi4nfdi.de/entity/Q3088470 | 2011-08-19 | Paper |
| Flowshop/no-idle scheduling to minimize total elapsed time | 2006-01-23 | Paper |
| Flowshop/no-idle scheduling to minimise the mean flowtime | 2006-01-23 | Paper |
| Bicriteria in a two-stage flowshop scheduling problem. | 2004-02-18 | Paper |
| Minimizing total elapsed time subject to zero total idle time of machines in \(n\times 3\) flowshop problem. | 2003-10-23 | Paper |
| Bicriteria in special flowshop problems | 2002-08-21 | Paper |
| https://portal.mardi4nfdi.de/entity/Q2780682 | 2002-04-21 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4227912 | 1999-02-02 | Paper |
| Sequencing with restrictions in processing times | 1998-08-02 | Paper |
| Minimizing Mean Completion Time for Special Flowshop Problems | 1997-06-16 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4338563 | 1997-05-28 | Paper |
| Scheduling of job-block with dead line in n\(\times 2\) flowshop problem with separated set up times | 1985-01-01 | Paper |
| Special Cases With Set Up Considerations for n×3 Flowshop Problem | 1985-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3321816 | 1984-01-01 | Paper |
| Optimal Algorithms for Job-Blocks in 2 × n Sequencing Problem with Transportation Times—A Computational Comparison | 1984-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3343752 | 1984-01-01 | Paper |
| Minimizing the makespan in a 2-machine flowshop with time lags and setup conditions | 1984-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3040915 | 1983-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3332756 | 1983-01-01 | Paper |
| Node elimination in three-machine flowshop scheduling problem | 1982-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3037111 | 1982-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3315255 | 1982-01-01 | Paper |
| The Sngle Machine Problem with Quadratic Penalty Function | 1982-01-01 | Paper |
| Single Machine Schednling Problem with Quadratic Function of Completion Times-A Modified Approach | 1981-01-01 | Paper |
| Flow-Shop Sequencing with no Intratnachine Waiting: Minimization of Total Waiting Cost | 1981-01-01 | Paper |
| Note—A Node Elimination Procedure for Townsend's Algorithm for Solving the Single Machine Quadratic Penalty Function Scheduling Problem | 1980-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3858001 | 1979-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3887201 | 1979-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3901285 | 1979-01-01 | Paper |
| A note on equivalent jobs for job blocks in job sequencing problems | 1978-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4143000 | 1977-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4146533 | 1976-01-01 | Paper |
| Two machine scheduling problem when passing allowed | 1973-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3212920 | 1973-01-01 | Paper |
| Two stage production schedule | 1970-01-01 | Paper |
| Sequencing with Random Service Times | 1970-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4772954 | 1969-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5545165 | 1968-01-01 | Paper |