| Publication | Date of Publication | Type |
|---|
| A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints | 2023-06-23 | Paper |
| A partition-based branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints | 2022-07-06 | Paper |
| Solution procedures for block selection and sequencing in flat-bedded potash underground mines | 2021-11-09 | Paper |
| A new mathematical formulation for a potash-mine shift scheduling problem with a simultaneous assignment of machines and workers | 2021-06-07 | Paper |
| A branch-and-bound procedure for the resource-constrained project scheduling problem with partially renewable resources and general temporal constraints | 2020-08-28 | Paper |
| A long-term unit commitment problem with hydrothermal coordination for economic and emission control in large-scale electricity systems | 2020-05-11 | Paper |
| Fix-and-optimize procedures for solving the long-term unit commitment problem with pumped storages | 2019-03-06 | Paper |
| Minimizing average project team size given multi-skilled workers with heterogeneous skill levels | 2018-07-12 | Paper |
| Mixed-integer linear programming and constraint programming formulations for solving resource availability cost problems | 2018-05-30 | Paper |
| Staff and machine shift scheduling in a German potash mine | 2018-02-28 | Paper |
| Two-Stage Heuristic Approach for Solving the Long-Term Unit Commitment Problem with Hydro-Thermal Coordination | 2017-12-01 | Paper |
| Models and solution procedures for the resource-constrained project scheduling problem with general temporal constraints and calendars | 2016-10-07 | Paper |
| Machine scheduling in underground mining: an application in the potash industry | 2016-05-04 | Paper |
| On a multi-project staffing problem with heterogeneously skilled workers | 2015-03-03 | Paper |
| MILP-Formulations for the Total Adjustment Cost Problem | 2015-02-12 | Paper |
| Many-to-many location-routing with inter-hub transport and multi-commodity pickup-and-delivery | 2015-02-03 | Paper |
| The total adjustment cost problem: applications, models, and solution algorithms | 2014-08-18 | Paper |
| Exact methods for the resource levelling problem | 2014-02-05 | Paper |
| Mixed-integer linear programming for resource leveling problems | 2012-12-29 | Paper |
| A heuristic approach to project staffing | 2012-05-13 | Paper |
| Dismantling of nuclear power plants at optimal NPV | 2011-11-17 | Paper |
| A new mixed integer linear model for a rich vehicle routing problem with docking constraints | 2011-04-08 | Paper |
| A Sampling Procedure for Real-Life Rich Vehicle Routing Problems | 2011-04-07 | Paper |
| Optimal Usage of Flexibility Instruments in Automotive Plants | 2011-04-07 | Paper |
| Production Chain Planning in the Automotive Industry | 2011-04-07 | Paper |
| A Branch-and-Cut Approach to the Vehicle Routing Problem with Simultaneous Delivery and Pick-up | 2011-04-07 | Paper |
| Scheduling tests in automotive R\&D projects | 2008-11-18 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3518847 | 2008-08-12 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3426442 | 2007-03-09 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3416596 | 2007-01-22 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4667090 | 2005-04-19 | Paper |
| A bidirectional heuristic for maximizing the net present value of large-scale projects subject to limited resources | 2004-03-15 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4437036 | 2003-12-07 | Paper |
| Order-based neighborhoods for project scheduling with nonregular objective functions. | 2003-07-30 | Paper |
| A steepest ascent approach to maximizing the net present value of projects | 2003-07-15 | Paper |
| Recent results on resource-constrained project scheduling with time windows: Models, solution methods, and applications | 2003-04-10 | Paper |
| Exact and truncated branch-and-bound procedures for resource-constrained project scheduling with discounted cash flows and general temporal constraints. | 2002-01-01 | Paper |
| Project scheduling with time windows and scarce resources. Temporal and resource-constrained project scheduling with regular and nonregular objective functions | 2001-10-11 | Paper |
| https://portal.mardi4nfdi.de/entity/Q2744163 | 2001-09-19 | Paper |
| https://portal.mardi4nfdi.de/entity/Q2712374 | 2001-05-06 | Paper |
| Procedures for resource leveling and net present value problems in project scheduling with general temporal and resource constraints | 2000-12-19 | Paper |
| Time complexity of single- and identical parallel-machine scheduling with GERT network precedence constraints | 2000-05-07 | Paper |
| Resource levelling for projects with schedule-dependent time windows | 1999-11-08 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4251544 | 1999-10-06 | Paper |
| Heuristic procedures for parallel-machine scheduling problems with stochastic precedence constraints | 1999-05-17 | Paper |