| Publication | Date of Publication | Type |
|---|
| Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates | 2023-07-10 | Paper |
| New resource-constrained project scheduling instances for testing (meta-)heuristic scheduling algorithms | 2023-07-04 | Paper |
| A prediction model for ranking branch-and-bound procedures for the resource-constrained project scheduling problem | 2023-07-03 | Paper |
| On the complexity of efficient multi-skilled team composition | 2023-07-03 | Paper |
| A classification and new benchmark instances for the multi-skilled resource-constrained project scheduling problem | 2023-07-03 | Paper |
| A Theoretical Framework for Instance Complexity of the Resource-Constrained Project Scheduling Problem | 2023-01-09 | Paper |
| Multimode time-cost-robustness trade-off project scheduling problem under uncertainty | 2022-07-18 | Paper |
| A reduction tree approach for the discrete time/cost trade-off problem | 2022-06-22 | Paper |
| New summary measures and datasets for the multi-project scheduling problem | 2022-03-11 | Paper |
| Finite inventory budgets in production capacity and safety stock placement under the guaranteed service approach | 2022-03-07 | Paper |
| An analysis of network and resource indicators for resource-constrained project scheduling problem instances | 2022-03-07 | Paper |
| Using earned value management and schedule risk analysis with resource constraints for project control | 2021-11-09 | Paper |
| The bilevel optimisation of a multi-agent project scheduling and staffing problem | 2021-11-05 | Paper |
| A new algorithm for resource-constrained project scheduling with breadth and depth of skills | 2021-06-07 | Paper |
| Using schedule risk analysis with resource constraints for project control | 2021-06-03 | Paper |
| A column generation-based diving heuristic to solve the multi-project personnel staffing problem with calendar constraints and resource sharing | 2021-05-21 | Paper |
| Optimizing production capacity and safety stocks in general acyclic supply chains | 2021-04-20 | Paper |
| Going to the core of hard resource-constrained project scheduling instances | 2021-04-20 | Paper |
| The impact of a limited budget on the corrective action taking process | 2020-06-17 | Paper |
| A decomposed branch-and-price procedure for integrating demand planning in personnel staffing problems | 2019-10-15 | Paper |
| Resource-constrained project scheduling with activity splitting and setup times | 2019-07-09 | Paper |
| An agency perspective for multi-mode project scheduling with time/cost trade-offs | 2019-02-19 | Paper |
| Computing project makespan distributions: Markovian PERT networks revisited | 2018-12-17 | Paper |
| The impact of solution representations on heuristic net present value optimization in discrete time/cost trade-off project scheduling with multiple cash flow and payment models | 2018-12-17 | Paper |
| A tabu search procedure for the resource-constrained project scheduling problem with alternative subgraphs | 2018-12-06 | Paper |
| A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints | 2018-12-03 | Paper |
| Maximising the weighted number of activity execution modes in project planning | 2018-07-25 | Paper |
| An exact composite lower bound strategy for the resource-constrained project scheduling problem | 2018-07-11 | Paper |
| A buffer control method for top-down project control | 2018-05-30 | Paper |
| A nearest neighbour extension to project duration forecasting with artificial intelligence | 2018-05-25 | Paper |
| Capital- and resource-constrained project scheduling with net present value optimization | 2018-05-24 | Paper |
| A perturbation matheuristic for the integrated personnel shift and task re-scheduling problem | 2018-05-17 | Paper |
| A resource type analysis of the integrated project scheduling and personnel staffing problem | 2017-08-16 | Paper |
| A metaheuristic solution approach for the time-constrained project scheduling problem | 2017-07-06 | Paper |
| Hybrid tabu search and a truncated branch-and-bound for the unrelated parallel machine scheduling problem | 2016-11-10 | Paper |
| An approach using SAT solvers for the RCPSP with logical constraints | 2016-10-07 | Paper |
| An exact algorithm for an integrated project staffing problem with a homogeneous workforce | 2016-05-12 | Paper |
| An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances | 2015-02-19 | Paper |
| https://portal.mardi4nfdi.de/entity/Q2923180 | 2014-10-15 | Paper |
| A hybrid genetic algorithm for the single machine maximum lateness problem with release times and family setups | 2012-11-15 | Paper |
| Multi-mode resource-constrained project scheduling using RCPSP and SAT solvers | 2012-05-14 | Paper |
| Using resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problem | 2012-05-08 | Paper |
| On Maximizing the Net Present Value of a Project Under Renewable Resource Constraints | 2012-02-19 | Paper |
| A finite-capacity production scheduling procedure for a Belgian steel company | 2011-07-06 | Paper |
| An evolutionary approach for the nurse rerostering problem | 2011-03-25 | Paper |
| A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows | 2010-10-25 | Paper |
| A hybrid scatter search heuristic for personalized crew rostering in the airline industry | 2010-06-11 | Paper |
| Branching strategies in a branch-and-price approach for a multiple objective nurse scheduling problem | 2010-05-07 | Paper |
| A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem | 2009-11-16 | Paper |
| Measuring time. Improving project performance using earned value management | 2009-11-11 | Paper |
| The discrete time/cost trade-off problem: Extensions and heuristic procedures | 2009-08-28 | Paper |
| A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem | 2009-08-13 | Paper |
| On the characterization and generation of nurse scheduling problem instances | 2009-06-30 | Paper |
| Scheduling an R&D Project with Quality-Dependent Time Slots | 2009-02-10 | Paper |
| Comparison and hybridization of crossover operators for the nurse scheduling problem | 2008-09-03 | Paper |
| A simulation and evaluation of earned value metrics to forecast the project duration | 2008-07-11 | Paper |
| Rangen: A random network generator for activity-on-the-node networks | 2007-12-20 | Paper |
| An evaluation of the adequacy of project network generators with systematically sampled networks | 2007-12-12 | Paper |
| A hybrid scatter search/electromagnetism meta-heuristic for project scheduling | 2005-10-26 | Paper |
| Maximizing the net present value of a project with linear time-dependent cash flows | 2005-05-31 | Paper |
| New computational results for the discrete time/cost trade-off problem with time-switch constraints | 2005-04-21 | Paper |
| Discrete time/cost trade-offs in project scheduling with time-switch constraints | 2005-03-14 | Paper |
| New computational results on the discrete time/cost trade-off problem in project networks | 2005-01-19 | Paper |
| Progress payments in project scheduling problems. | 2003-06-18 | Paper |
| An exact procedure for the resource-constrained weighted earliness-tardiness project scheduling problem | 2001-10-31 | Paper |