| Publication | Date of Publication | Type |
|---|
| Fleet Coordination in Decentralized Humanitarian Operations Funded by Earmarked Donations | 2021-01-08 | Paper |
| Managing high-end ex-demonstration product returns | 2019-03-28 | Paper |
| Installed base management versus selling in monopolistic and competitive environments | 2018-11-19 | Paper |
| Official recycling and scavengers: symbiotic or conflicting? | 2012-08-16 | Paper |
| Queuing for Expert Services | 2012-02-29 | Paper |
| Reverse Channel Design: The Case of Competing Retailers | 2012-02-21 | Paper |
| Time Value of Commercial Product Returns | 2012-02-21 | Paper |
| The Economics of Remanufacturing Under Limited Component Durability and Finite Product Life Cycles | 2012-02-21 | Paper |
| Closed-Loop Supply Chain Models with Product Remanufacturing | 2012-02-19 | Paper |
| Inventory Control in Hybrid Systems with Remanufacturing | 2012-02-12 | Paper |
| Quality competition for screening and treatment services | 2010-11-03 | Paper |
| On the effect of quality overestimation in remanufacturing | 2010-10-25 | Paper |
| From preparedness to partnerships: case study research on humanitarian logistics | 2010-05-31 | Paper |
| OR FORUM—The Evolution of Closed-Loop Supply Chain Research | 2010-03-06 | Paper |
| Lagrangean relaxation based heuristics for lot sizing with setup times | 2008-11-20 | Paper |
| Branch and bound algorithms for single machine scheduling with batching to minimize the number of late jobs | 2007-12-20 | Paper |
| Humanitarian aid logistics: supply chain management in high gear | 2006-07-06 | Paper |
| Concurrent product and closed-loop supply chain design with an application to refrigerators | 2005-04-26 | Paper |
| The effect of remanufacturing on procurement decisions for resellers in secondary markets | 2005-02-09 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3158094 | 2005-01-20 | Paper |
| Cooperation between strands of practice: challenges and opportunities for the renewal of OR | 2005-01-19 | Paper |
| Ethics outside, within, or beyond OR models? | 2004-01-05 | Paper |
| Local Search Heuristics for the Single Machine Total Weighted Tardiness Scheduling Problem | 2003-12-16 | Paper |
| The impact of ERP on supply chain management: Exploratory findings from a European Delphi study | 2003-04-10 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3151767 | 2002-10-16 | Paper |
| The domain and interpretation of utility functions: An exploration | 2002-08-21 | Paper |
| Knowledge Driven Quality Improvement | 2002-07-08 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4499921 | 2000-09-04 | Paper |
| Solving the discrete lotsizing and scheduling problem with sequence dependent set-up costs and set-up times using the travelling salesman problem with time windows | 1999-08-19 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3839014 | 1999-06-08 | Paper |
| Strands of practice in OR (the practitioner's dilemma) | 1999-05-05 | Paper |
| Quantitative models for reverse logistics: A review | 1999-04-27 | Paper |
| Branch and bound algorithms for single-machine scheduling with batch set-up times to minimize total weighted completion time | 1999-03-07 | Paper |
| Local search heuristics for single-machine scheduling with batching to minimize the number of late jobs | 1998-11-29 | Paper |
| Interactions between operational research and environmental management | 1998-11-05 | Paper |
| The capacitated distribution and waste disposal problem | 1998-10-07 | Paper |
| Decentralization of responsibility for site decontamination projects: A budget allocation approach | 1998-07-14 | Paper |
| Exact and approximation algorithms for the operational fixed interval scheduling problem | 1998-06-11 | Paper |
| An integrated and structured approach to improve maintenance | 1998-06-11 | Paper |
| Exact and Approximation Algorithms for the Tactical Fixed Interval Scheduling Problem | 1998-06-02 | Paper |
| Local search heuristics for single machine scheduling with batch set-up times to minimize total weighted completion time | 1997-12-04 | Paper |
| Single Machine Scheduling to Minimize Total Weighted Late Work | 1996-10-20 | Paper |
| The Two-Stage Assembly Scheduling Problem: Complexity and Approximation | 1995-09-25 | Paper |
| On the coordination of product and by-product flows in two-level distribution networks: Model formulations and solution procedures | 1995-02-09 | Paper |
| A Fully Polynomial Approximation Scheme for Scheduling a Single Machine to Minimize Total Weighted Late Work | 1994-11-17 | Paper |
| A set partitioning heuristic for the generalized assignment problem | 1994-05-05 | Paper |
| The single-item discrete lotsizing and scheduling problem: Optimization by linear and dynamic programming | 1994-03-24 | Paper |
| A Dual Ascent and Column Generation Heuristic for the Discrete Lotsizing and Scheduling Problem with Setup Times | 1993-08-31 | Paper |
| Statistical search methods for lotsizing problems | 1993-08-16 | Paper |
| A survey of algorithms for the generalized assignment problem | 1993-01-16 | Paper |
| https://portal.mardi4nfdi.de/entity/Q4016681 | 1993-01-16 | Paper |
| Single Machine Scheduling to Minimize Total Late Work | 1993-01-16 | Paper |
| Integrating Scheduling with Batching and Lot-Sizing: A Review of Algorithms and Complexity | 1993-01-16 | Paper |
| Approximation algorithms for scheduling a single machine to minimize total late work | 1992-12-17 | Paper |
| Some Extensions of the Discrete Lotsizing and Scheduling Problem | 1992-06-26 | Paper |
| Multilevel capacitated lotsizing complexity and LP-based heuristics | 1991-01-01 | Paper |
| Set partitioning and column generation heuristics for capacitated dynamic lotsizing | 1990-01-01 | Paper |
| A survey of algorithms for the single machine total weighted tardiness scheduling problem | 1990-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q5202818 | 1990-01-01 | Paper |
| Multi-Item Single-Level Capacitated Dynamic Lot-Sizing Heuristics: A General Review | 1988-01-01 | Paper |
| Algorithms for Scheduling a Single Machine to Minimize the Weighted Number of Late Jobs | 1988-01-01 | Paper |
| Dynamic programming and decomposition approaches for the single machine total tardiness problem | 1987-01-01 | Paper |
| A simple heuristic for the multi-item single level capacitated lotsizing problem | 1986-01-01 | Paper |
| A Multiplier Adjustment Method for the Generalized Assignment Problem | 1986-01-01 | Paper |
| A Branch and Bound Algorithm for the Total Weighted Tardiness Problem | 1985-01-01 | Paper |
| An algorithm for single machine sequencing with deadlines to minimize total weighted completion time | 1983-01-01 | Paper |
| A bicriterion approach to time/cost trade-offs in sequencing | 1982-01-01 | Paper |
| A decomposition algorithm for the single machine total tardiness problem | 1982-01-01 | Paper |
| https://portal.mardi4nfdi.de/entity/Q3938826 | 1982-01-01 | Paper |
| A large scale location-allocation problem in the natural rubber industry | 1981-01-01 | Paper |
| Solving a bicriterion scheduling problem | 1979-01-01 | Paper |
| Four solution techniques for a general one machine scheduling problem. A comparative study | 1978-01-01 | Paper |