Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

Optimal scheduling of continuous production with constrained schedule structure

From MaRDI portal
Publication:1002863
Jump to:navigation, search

DOI10.1007/S10513-008-1015-XzbMath1156.93360OpenAlexW4236703031MaRDI QIDQ1002863

Yu. M. Tsodikov

Publication date: 26 February 2009

Published in: Automation and Remote Control (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1007/s10513-008-1015-x


zbMATH Keywords

mixed-integer programmingcontinuous-discrete productionmulti-period production scheduling


Mathematics Subject Classification ID

Mixed integer programming (90C11) Deterministic scheduling theory in operations research (90B35) Discrete-time control/observation systems (93C55)


Related Items (1)

Equipment selection models for oil mixing systems







This page was built for publication: Optimal scheduling of continuous production with constrained schedule structure

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1002863&oldid=12996394"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 20:54.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki