Hybrid approach to the rational management of machine replacement
From MaRDI portal
Publication:1003519
DOI10.1016/j.nahs.2006.03.007zbMath1279.90053OpenAlexW2019105102MaRDI QIDQ1003519
Publication date: 4 March 2009
Published in: Nonlinear Analysis. Hybrid Systems (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.nahs.2006.03.007
Integer programming (90C10) Nonlinear programming (90C30) Management decision making, including multiple objectives (90B50) Reliability, availability, maintenance, inspection in operations research (90B25)
Cites Work
- Unnamed Item
- Unnamed Item
- Turnpike and optimal trajectories in integral dynamic models with endogeneous delay
- The optimal lifetime of capital equipment
- A model for equipment replacement due to technological obsolescence
- Replacement and the rental value of capital equipment subject to obsolescence
- Replacement echoes in the vintage capital growth model
- Applied mathematical modelling of engineering problems
- A paradox in equipment replacement under technological improvement
- Modeling and optimization of the lifetime of technologies
- A model for parallel machine replacement with capacity expansion
- Structure of optimal trajectories in a nonlinear dynamic model with endogenous delay
- Optimization of the lifetime of capital equipment using integral models
- Optimal equipment replacement without paradoxes: A continuous analysis
- Planning Horizon Procedures for Machine Replacement Models
- Minimal forecast horizons in equipment replacement models with multiple technologies and general switching costs
- A parallel machine replacement model
- Integral-functional equations for optimal renovation problems
- Utilizing Weibull Failure Rates in Repair Limit Analysis for Equipment Replacement/Preventive Maintenance Decisions
This page was built for publication: Hybrid approach to the rational management of machine replacement