Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Create a new EntitySchema
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A multi-criteria scheduling with due-window assignment problem

From MaRDI portal
Publication:1007672
Jump to:navigation, search

DOI10.1016/j.mcm.2007.08.018zbMath1156.90369OpenAlexW2067865850MaRDI QIDQ1007672

Gur Mosheiov, Assaf Sarig

Publication date: 23 March 2009

Published in: Mathematical and Computer Modelling (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.mcm.2007.08.018

zbMATH Keywords

schedulingearliness-tardinessmulti-criteriadue-windowflow-time


Mathematics Subject Classification ID

Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35)


Related Items

A survey on scheduling problems with due windows



Cites Work

  • Unnamed Item
  • Determination of common due window location in a single machine scheduling problem
  • A survey of the state-of-the-art of common due date assignment and scheduling research
  • Simultaneous minimization of total completion time and total deviation of job completion times
  • Multicriteria scheduling
  • Common due window size and location determination in a single machine scheduling problem
  • Common Due Date Assignment to Minimize Total Penalty for the One Machine Scheduling Problem
Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1007672&oldid=13002012"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 22:08.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki