Sequencing mixed-model assembly lines: survey, classification and model critique

From MaRDI portal
Publication:1011163

DOI10.1016/j.ejor.2007.09.013zbMath1157.90405OpenAlexW2062353757MaRDI QIDQ1011163

Armin Scholl, Nils Boysen, Malte Fliedner

Publication date: 8 April 2009

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://www.db-thueringen.de/receive/dbt_mods_00016112




Related Items

An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goalBalancing and sequencing of parallel mixed-model assembly linesBalancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workloadSolving a bi-objective mixed-model assembly-line sequencing using metaheuristic algorithms considering ergonomic factors, customer behavior, and periodic maintenancePacked parts delivery problem of automotive inbound logistics with a supplier parkA GRASP approach for the extended car sequencing problemScheduling the part supply of mixed-model assembly lines in line-integrated supermarketsDecomposition methods for cost and tardiness reduction in aircraft manufacturing flow linesAssembly line balancing: what happened in the last fifteen years?A bi-objective mixed-model assembly line sequencing problem considering customer satisfaction and customer buying behaviourUpgrade auctions in build-to-order manufacturing with loss-averse customersScheduling a single vehicle in the just-in-time part supply for a mixed-model assembly lineAn effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly linesMinimizing the number of stations and station activation costs for a production lineThe multi-objective assembly line worker integration and balancing problem of type-2A decomposition approach for the car resequencing problem with selectivity banksBalancing mixed-model assembly lines using adjacent cross-training in a demand variation environmentReducing ergonomic risks by job rotation schedulingApplying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a make-to-order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algorithmA scatter search based hyper-heuristic for sequencing a mixed-model assembly lineIntegrated real-time control of mixed-model assembly lines and their part feeding processesMinimizing sequence-dependent setup costs in feeding batch processes under due date restrictionsSequencing mixed-model assembly lines with demand management: problem development and efficient multi-objective algorithmsIn-line kitting for part feeding of assembly lines: workload balancing and storage assignment to reduce the workers' walking effortLine configuration to minimize setup costsBalancing a robotic spot welding manufacturing line: an industrial case studyProcedures for the time and space constrained assembly line balancing problemInteger programming models versus advanced planning business software for a multi-level mixed-model assembly line problemOn the part inventory model sequencing problem: complexity and beam search heuristicBalancing and scheduling of flexible mixed model assembly linesDeveloping optimization \& robust models for a mixed-model assembly line balancing problem with semi-automated operationsCombinatorial Benders cuts for assembly line balancing problems with setupsOptimal production sequencing problem to minimise line stoppage time in a mixed-model assembly lineOptimization framework for process scheduling of operation-dependent automobile assembly linesModels for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plantEnhanced multi-hoffmann heuristic for efficiently solving real-world assembly line balancing problems in automotive industryLevel scheduling under limited resequencing flexibilitySolving symmetric mixed-model multi-level just-in-time scheduling problemsSolving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rulesLevel scheduling for batched JIT supplyAnalysis and design of sequencing rules for car sequencingScheduling just-in-time part supply for mixed-model assembly linesSequencing mixed-model assembly lines to minimize part inventory costBenders' decomposition for the balancing of assembly lines with stochastic demandRobust car sequencing for automotive assemblyPart logistics in the automotive industry: decision problems, literature review and research agendaStochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristicsComplementary column generation and bounding approaches for set partitioning formulationsCar sequencing versus mixed-model sequencing: a computational studyModeling sequence scrambling and related phenomena in mixed-model production linesA simheuristic approach for throughput maximization of asynchronous buffered stochastic mixed-model assembly linesThe product rate variation problem and its relevance in real world mixed-model assembly linesLevel scheduling of mixed-model assembly lines under storage constraintsConsidering Distribution Logistics in Production Sequencing: Problem Definition and Solution AlgorithmNew Notation and Classification Scheme for Vehicle Routing ProblemsMultiobjective fuzzy mixed assembly line sequencing optimization modelIterative beam search for car sequencingInteractive bicriterion decision support for a large scale industrial scheduling system



Cites Work