Sequencing mixed-model assembly lines: survey, classification and model critique
From MaRDI portal
Publication:1011163
DOI10.1016/j.ejor.2007.09.013zbMath1157.90405OpenAlexW2062353757MaRDI QIDQ1011163
Armin Scholl, Nils Boysen, Malte Fliedner
Publication date: 8 April 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://www.db-thueringen.de/receive/dbt_mods_00016112
Related Items
An iterated beam search algorithm for the multi-level production smoothing problem with workload smoothing goal ⋮ Balancing and sequencing of parallel mixed-model assembly lines ⋮ Balancing mixed-model assembly lines: a computational evaluation of objectives to smoothen workload ⋮ Solving a bi-objective mixed-model assembly-line sequencing using metaheuristic algorithms considering ergonomic factors, customer behavior, and periodic maintenance ⋮ Packed parts delivery problem of automotive inbound logistics with a supplier park ⋮ A GRASP approach for the extended car sequencing problem ⋮ Scheduling the part supply of mixed-model assembly lines in line-integrated supermarkets ⋮ Decomposition methods for cost and tardiness reduction in aircraft manufacturing flow lines ⋮ Assembly line balancing: what happened in the last fifteen years? ⋮ A bi-objective mixed-model assembly line sequencing problem considering customer satisfaction and customer buying behaviour ⋮ Upgrade auctions in build-to-order manufacturing with loss-averse customers ⋮ Scheduling a single vehicle in the just-in-time part supply for a mixed-model assembly line ⋮ An effective hybrid honey bee mating optimization algorithm for balancing mixed-model two-sided assembly lines ⋮ Minimizing the number of stations and station activation costs for a production line ⋮ The multi-objective assembly line worker integration and balancing problem of type-2 ⋮ A decomposition approach for the car resequencing problem with selectivity banks ⋮ Balancing mixed-model assembly lines using adjacent cross-training in a demand variation environment ⋮ Reducing ergonomic risks by job rotation scheduling ⋮ Applying available-to-promise (ATP) concept in mixed-model assembly line sequencing problems in a make-to-order (MTO) environment: problem extension, model formulation and Lagrangian relaxation algorithm ⋮ A scatter search based hyper-heuristic for sequencing a mixed-model assembly line ⋮ Integrated real-time control of mixed-model assembly lines and their part feeding processes ⋮ Minimizing sequence-dependent setup costs in feeding batch processes under due date restrictions ⋮ Sequencing mixed-model assembly lines with demand management: problem development and efficient multi-objective algorithms ⋮ In-line kitting for part feeding of assembly lines: workload balancing and storage assignment to reduce the workers' walking effort ⋮ Line configuration to minimize setup costs ⋮ Balancing a robotic spot welding manufacturing line: an industrial case study ⋮ Procedures for the time and space constrained assembly line balancing problem ⋮ Integer programming models versus advanced planning business software for a multi-level mixed-model assembly line problem ⋮ On the part inventory model sequencing problem: complexity and beam search heuristic ⋮ Balancing and scheduling of flexible mixed model assembly lines ⋮ Developing optimization \& robust models for a mixed-model assembly line balancing problem with semi-automated operations ⋮ Combinatorial Benders cuts for assembly line balancing problems with setups ⋮ Optimal production sequencing problem to minimise line stoppage time in a mixed-model assembly line ⋮ Optimization framework for process scheduling of operation-dependent automobile assembly lines ⋮ Models for MMSP-W considering workstation dependencies: a case study of Nissan's Barcelona plant ⋮ Enhanced multi-hoffmann heuristic for efficiently solving real-world assembly line balancing problems in automotive industry ⋮ Level scheduling under limited resequencing flexibility ⋮ Solving symmetric mixed-model multi-level just-in-time scheduling problems ⋮ Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimisation and interruption rules ⋮ Level scheduling for batched JIT supply ⋮ Analysis and design of sequencing rules for car sequencing ⋮ Scheduling just-in-time part supply for mixed-model assembly lines ⋮ Sequencing mixed-model assembly lines to minimize part inventory cost ⋮ Benders' decomposition for the balancing of assembly lines with stochastic demand ⋮ Robust car sequencing for automotive assembly ⋮ Part logistics in the automotive industry: decision problems, literature review and research agenda ⋮ Stochastic mixed-model assembly line sequencing problem: mathematical modeling and Q-learning based simulated annealing hyper-heuristics ⋮ Complementary column generation and bounding approaches for set partitioning formulations ⋮ Car sequencing versus mixed-model sequencing: a computational study ⋮ Modeling sequence scrambling and related phenomena in mixed-model production lines ⋮ A simheuristic approach for throughput maximization of asynchronous buffered stochastic mixed-model assembly lines ⋮ The product rate variation problem and its relevance in real world mixed-model assembly lines ⋮ Level scheduling of mixed-model assembly lines under storage constraints ⋮ Considering Distribution Logistics in Production Sequencing: Problem Definition and Solution Algorithm ⋮ New Notation and Classification Scheme for Vehicle Routing Problems ⋮ Multiobjective fuzzy mixed assembly line sequencing optimization model ⋮ Iterative beam search for car sequencing ⋮ Interactive bicriterion decision support for a large scale industrial scheduling system
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systems
- On the complexity of the car sequencing problem.
- Multi-criteria sequencing problem for a mixed-model assembly line in a JIT production system
- Comments on ``solving real car sequencing problems with ant colony optimization [\textit{C. Gagné} et al., Eur. J. Oper. Res. 174, No. 3, 1427--1448 (2006: Zbl 1103.90409)]
- Balancing and sequencing mixed-model just-in-time \(U\)-lines with multiple objectives
- Algorithms for the car sequencing and the level scheduling problem
- Response time variability
- The car sequencing problem: overview of state-of-the-art methods and industrial case-study of the ROADEF'2005 challenge problem
- Iterated tabu search for the car sequencing problem
- A hybrid heuristic for a multi-objective real-life car sequencing problem with painting and assembly line constraints
- An integer linear programming approach and a hybrid variable neighborhood search for the car sequencing problem
- Solving the car sequencing problem via branch \& bound
- The sequence-dependent assembly line balancing problem
- Manufacturing flow line systems: A review of models and analytical results
- Heuristics and exact algorithms for solving the Monden problem
- Traditional heuristic versus Hopfield neural network approaches to a car sequencing problem
- Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines
- A simple approach to the product rate variation problem via axiomatics
- The mixed and multi model line balancing problem: A comparison
- Optimal level schedules in mixed-model, multi-level JIT assembly systems with pegging
- Algorithms for real-time scheduling of jobs on mixed model assembly lines
- Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
- Sequencing in mixed model assembly lines: A genetic algorithm approach
- Using beam search techniques for sequencing mixed-model assembly lines
- A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines.
- Cyclic just-in-time sequences are optimal
- Human factor policy testing in the sequencing of manual mixed model assembly lines.
- Properties of a sequencing problem for a mixed model assembly line with conveyor stoppages
- A transformed two-stage method for reducing the part-usage variation and a comparison of the product-level and part-level solutions in sequencing mixed-model assembly lines
- Resource-constrained project scheduling: Notation, classification, models, and methods
- Constraint satisfaction problems: Algorithms and applications
- A typology of cutting and packing problems
- Monolithic vs. hierarchical balancing and scheduling of a flexible assembly line
- A correlation and heuristic approach for obtaining production sequences requiring a minimum of tool replacements
- Supply chain planning in the German automotive industry
- On small deviations conjecture
- Algorithms for mixed-model sequencing with due date restrictions
- A simple sequencing algorithm for mixed-model assembly lines in just-in- time production systems
- Minimizing variation of production rates in just-in-time systems: A survey
- A classification of assembly line balancing problems
- Solving real car sequencing problems with ant colony optimization
- A multi-objective genetic algorithm for mixed-model sequencing on JIT assembly lines
- Pattern based vocabulary building for effectively sequencing mixed-model assembly lines
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing
- A survey on problems and methods in generalized assembly line balancing
- An endosymbiotic evolutionary algorithm for the integration of balancing and sequencing in mixed-model U-lines
- Controlling mixed-model assembly lines in real-time by using distributed systems
- Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem
- A methodology for modeling inter-company supply chains and for evaluating a method of integrated product and process documentation
- Sequencing JIT Mixed-Model Assembly Lines Under Station-Load and Part-Usage Constraints
- Algorithms for Toyota's goal of sequencing mixed models on an assembly line with multiple workstations
- A sequential ordering problem in automotive paint shops
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”
- Note—Sequencing JIT Mixed-Model Assembly Lines
- Developing production schedules which balance part usage and smooth production loads for just-in-time production systems
- Review and comparison of three methods for the solution of the car sequencing problem
- Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times
- A Survey of Exact Algorithms for the Simple Assembly Line Balancing Problem
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production Systems
- An analytic framework for sequencing mixed model assembly lines
- A comparative analysis of sequencing procedures for mixed-model assembly lines in a just-in-time production system
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
- A simulation analysis for two-level sequence-scheduling for just-in-time (JIT) mixed-model assembly lines
- Evaluating sequences for paced, mixed-model assembly lines with JIT component fabrication
- A parametric procedure for multicriterion sequence scheduling for JustIn-Time mixed-model assembly lines
- Mixed-model assembly line sequencing heuristics for smoothing component parts usage: A comparative analysis
- Using simulated annealing to solve a multiobjective assembly line balancing problem with parallel workstations
- Level Schedules for Mixed-Model, Just-in-Time Processes
- Stochastic procedures for scheduling minimum job sets on mixed model assembly lines
- Sequencing jobs on an automobile assembly line: objectives and procedures
- Sequencing mixed-model assembly lines to level parts usage and minimize line length
- Scheduling duplicate serial stations in transfer lines
- Revisiting the mixed-model multi-level just-in-time scheduling problem
- Discussion A note on 'scheduling mixed-model multi-level just-in-time production systems’*
- A mathematical model for selecting mixed models with due dates
- The effect of breakdowns on U-shaped production lines
- Balancing and sequencing manual mixed-model assembly lines
- Bicriteria sequencing for just-in-time mixed-model assembly lines
- Designing a mixed-model, open-station assembly line using mixed-integer programming
- Balancing assembly lines: an industrial case study
- Sequencing problem for a mixed-model assembly line in the Toyota production system
- The U-line Line Balancing Problem
- Mixed-Model Sequencing to Minimize Utility Work and the Risk of Conveyor Stoppage
- A Note on the Relation between the Product Rate Variation (PRV) Problem and the Apportionment Problem
- Integration of AI and OR Techniques in Constraint Programming for Combinatorial Optimization Problems
- A Computational Analysis Of Balanced Jit Optimization Algorithms
- Bicriteria sequencing methods for the mixed-model assembly line in just-in-time production systems