Setting safety stocks in multi-stage inventory systems under rolling horizon mathematical programming models
From MaRDI portal
Publication:1017965
DOI10.1007/s00291-007-0086-3zbMath1160.90372DBLPjournals/ors/BoulaksilFH09OpenAlexW2107184209WikidataQ57538539 ScholiaQ57538539MaRDI QIDQ1017965
Youssef Boulaksil, Jan C. Fransoo, Ernico N. G. van Halm
Publication date: 13 May 2009
Published in: OR Spectrum (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/s00291-007-0086-3
Deterministic scheduling theory in operations research (90B35) Production models (90B30) Inventory, storage, reservoirs (90B05)
Related Items (2)
ABC β–a heuristic for dynamic capacitated lot sizing with random demand under a fill rate constraint ⋮ Probabilistic modeling of multiperiod service levels
Uses Software
Cites Work
- Supply chain management and advanced planning -- basics, overview and challenges
- Linear programming models with planned lead times for supply chain operations planning
- MRP and inventories
- Materials coordination in stochastic multi-echelon systems
- Multi-echelon systems: A service measure perspective
- Dynamic programming algorithms for multi-stage safety stock optimization
- Multilevel Lot Sizing with Setup Times and Multiple Constrained Resources: Internally Rolling Schedules with Lot-Sizing Windows
- Mathematical Programming Approaches to Capacity-Constrained MRP Systems: Review, Formulation and Problem Reduction
- A Lagrangean-Based Heuristic for Dynamic Multilevel Multiitem Constrained Lotsizing with Setup Times
This page was built for publication: Setting safety stocks in multi-stage inventory systems under rolling horizon mathematical programming models