A genetic algorithm for flowshop scheduling with multiple objectives
From MaRDI portal
Publication:1018947
DOI10.1007/BF03398787zbMath1161.90398OpenAlexW2775515374MaRDI QIDQ1018947
Publication date: 26 May 2009
Published in: Opsearch (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf03398787
Multi-objective and goal programming (90C29) Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59)
Related Items (1)
Cites Work
- Unnamed Item
- Unnamed Item
- Benchmarks for basic scheduling problems
- Optimal two- and three-stage production schedules with setup times included
- The Complexity of Flowshop and Jobshop Scheduling
- A Heuristic Algorithm for the n Job, m Machine Sequencing Problem
- Constructive and composite heuristic solutions to the \(P\|\sum C_i\) scheduling problem
This page was built for publication: A genetic algorithm for flowshop scheduling with multiple objectives