Release time decision policy of software employed for the safety of critical system under uncertainty
From MaRDI portal
Publication:1019277
DOI10.1007/BF03398814zbMath1176.90293OpenAlexW2772477287WikidataQ110661160 ScholiaQ110661160MaRDI QIDQ1019277
P. K. Kapur, P. C. Jha, Deepali Gupta, Anshu Gupta
Publication date: 2 June 2009
Published in: Opsearch (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1007/bf03398814
Related Items (1)
Cites Work
- Unnamed Item
- Fuzzy mathematical programming and fuzzy matrix games
- A procedure for ordering fuzzy subsets of the unit interval
- Fuzzy nonlinear programming for mixed-discrete design optimization through hybrid genetic algorithm
- Cost–reliability optimum release policies for a software system under penalty cost
- Optimal sofware release policies for software reliability growth models under imperfect debugging
- Optimal release policies for a flexible software reliability growth model
- Time-Dependent Error-Detection Rate Model for Software Reliability and Other Performance Measures
- Contributions to Hardware and Software Reliability
- A software cost model with imperfect debugging, random life cycle and penalty cost
- Bicriterion release policy for exponential software reliability growth model
- Fuzzy sets
- Decision-Making in a Fuzzy Environment
This page was built for publication: Release time decision policy of software employed for the safety of critical system under uncertainty