Two-phase heuristics for scheduling of multiple projects
From MaRDI portal
Publication:1019555
DOI10.1504/IJOR.2009.022598zbMath1161.90535MaRDI QIDQ1019555
Publication date: 3 June 2009
Published in: International Journal of Operational Research (Search for Journal in Brave)
performance measuresresource constraintsmultiple projectsmulti-project schedulinglook-ahead heuristicsnon-look-ahead heuristicsproject selection rules
Deterministic scheduling theory in operations research (90B35) Approximation methods and heuristics in mathematical programming (90C59) Stochastic scheduling theory in operations research (90B36)
Related Items
Multi-project scheduling: a benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates, Multi-project scheduling with two-stage decomposition, Resource Constrained Multi-Project Scheduling Problem with Resource Transfer Times