Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties
From MaRDI portal
Publication:1027605
DOI10.1016/j.ejor.2008.09.001zbMath1163.90562OpenAlexW2055951538MaRDI QIDQ1027605
F. I. Dehayem Nodem, Ali Gharbi, Jean-Pierre Kenné
Publication date: 30 June 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2008.09.001
optimal controlmanufacturing systemsnumerical methodsproduction planningreplacementdamage failuresimperfect repairs
Related Items (5)
Joint optimization of condition-based maintenance and production lot-sizing ⋮ Two-state optimal maintenance planning of repairable systems with covariate effects ⋮ Production and replacement policies for a deteriorating manufacturing system under random demand and quality ⋮ Condition-Based Release of Maintenance Jobs in a Decentralized Multi-Stage Production/Maintenance System ⋮ Condition-based Maintenance Policy for decentralised Production/Maintenance-Control
Cites Work
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Unnamed Item
- Control of production and corrective maintenance rates in a multiple-machine, multiple-product manufacturing system
- Age-dependent production planning and maintenance strategies in unreliable manufacturing systems with lost sale
- Hedging point policy improvement
- A note on optimal replacement policy under general repair
- A discrete semi-Markov decision model to determine the optimal repair/replace- ment policy under general repairs
- Replacement policies for a cumulative damage model with minimal repair at failure
- Optimal Policy for Minimal Repair
- Some results for repairable systems with general repair
- Analytical Evaluation of Hierarchical Planning Systems
- A numerical method in optimal production and setup scheduling of stochastic manufacturing systems
- Decision making in industrial production planning using fuzzy linear programming
- Production/maintenance cooperative scheduling using multi-agents and fuzzy logic
- A fuzzy logic approach to an integrated maintenance/production scheduling algorithm
- The elixir of life: using a maintenance, repair and replacement model based on virtual and operating age in the water industry
- Manufacturing flow control and preventing maintenance: a stochastic control approach
This page was built for publication: Hierarchical decision making in production and repair/replacement planning with imperfect repairs under uncertainties