Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine
From MaRDI portal
Publication:1037662
DOI10.1016/J.EJOR.2009.03.018zbMath1175.90184OpenAlexW2156976424MaRDI QIDQ1037662
Publication date: 16 November 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2009.03.018
Related Items (5)
Minimizing the weighted number of tardy jobs on multiple machines: a review ⋮ Survey and extensions of manufacturing models in two-stage flexible flow shops with dedicated machines ⋮ A heuristic method for two-stage hybrid flow shop with dedicated machines ⋮ A hybrid meta-heuristic algorithm to minimize the number of tardy jobs in a dynamic two-machine flow shop problem ⋮ Total completion time minimization in a \(2\)-stage differentiation flowshop with fixed sequences per job type
Cites Work
- The strong NP-hardness of two-stage flowshop scheduling with a common second-stage machine
- Two-stage flowshop scheduling with a common second-stage machine
- Heuristics for the two-stage job shop scheduling problem with a bottleneck machine
- Flow shop and open shop scheduling with a critical machine and two operations per job
- Scheduling shops to minimize the weighted number of late jobs
- Optimal two- and three-stage production schedules with setup times included
- A Solvable Case of the One-Machine Scheduling Problem with Ready and Due Times
This page was built for publication: Minimum weighted number of tardy jobs on an \(m\)-machine flow-shop with a critical machine