A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem

From MaRDI portal
Publication:1037664

DOI10.1016/j.ejor.2009.03.034zbMath1175.90205OpenAlexW2065515777MaRDI QIDQ1037664

Mario Vanhoucke, Vincent Van Peteghem

Publication date: 16 November 2009

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2009.03.034




Related Items (max. 100)

Meta-heuristic solution with considering setup time for multi-skilled project scheduling problemA heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraintsAn automatic algorithm selection approach for the multi-mode resource-constrained project scheduling problemAn effective branch-and-price algorithm for the preemptive resource constrained project scheduling problem based on minimal interval order enumerationScheduling resource-constrained projects with a flexible project structureAn effective shaking procedure for 2D and 3D strip packing problemsMulti-mode resource-constrained project scheduling problems with non-preemptive activity splittingA path-relinking algorithm for the multi-mode resource-constrained project scheduling problemMatching formulation of the staff transfer problem: meta-heuristic approachesControllable processing times in project and production management: analysing the trade-off between processing times and the amount of resourcesIntegrated multi-project planning and scheduling -- a multiagent approachProject scheduling with finite or infinite number of activity processing modes -- a surveyMulti‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristicUsing resource scarceness characteristics to solve the multi-mode resource-constrained project scheduling problemMulti-mode resource-constrained project scheduling using RCPSP and SAT solversAn applicable method for modifying over-allocated multi-mode resource constraint schedules in the presence of preemptive resourcesTime and work generalised precedence relationships in project scheduling with pre-emption: an application to the management of service centresA modified PSO algorithm for minimizing the total costs of resources in MRCPSPAn efficient particle swarm optimizer with application to man-day project scheduling problemsBranch and bound algorithms for resource constrained project scheduling problem subject to nonrenewable resources with prescheduled procurementMultimode preemptive resource investment problem subject to due dates for activities: formulation and solution procedureConsidering project management activities for engineering design groupsAn updated survey of variants and extensions of the resource-constrained project scheduling problemMode-based versus activity-based search for a nonredundant resolution of the multimode resource-constrained project scheduling problemA multi-threaded local search algorithm and computer implementation for the multi-mode, resource-constrained multi-project scheduling problemMulti-mode resource-constrained project scheduling problem with material ordering under bonus-penalty policiesDiscrete and continuous-time formulations for dealing with break periods: preemptive and non-preemptive schedulingAn experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instancesResource-constrained project scheduling with activity splitting and setup timesReactive scheduling in the multi-mode RCPSPA new algorithm for resource-constrained project scheduling with breadth and depth of skillsA robust optimization approach for the multi-mode resource-constrained project scheduling problemA modified modeling approach and a heuristic procedure for the multi-mode resource constrained project scheduling problem with activity splittingModel and algorithm for human resource-constrained R\&D program scheduling optimizationRailway scheduling reduces the expected project makespan over roadrunner scheduling in a multi-mode project scheduling environmentFuzzy multi-objective chance-constrained programming model for hazardous materials transportationOn the choice of baseline schedules for the discrete time/resource trade-off problem under stochastic environmentA priority-rule method for project scheduling with work-content constraintsResource-Constrained Scheduling with Non-constant Capacity and Non-regular ActivitiesSchedule generation scheme for solving multi-mode resource availability cost problem by modified particle swarm optimizationSolving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms


Uses Software


Cites Work


This page was built for publication: A genetic algorithm for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problem