Mathematical Research Data Initiative
Main page
Recent changes
Random page
Help about MediaWiki
Create a new Item
Create a new Property
Merge two items
In other projects
Discussion
View source
View history
Purge
English
Log in

A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns

From MaRDI portal
Publication:1037696
Jump to:navigation, search

DOI10.1016/J.EJOR.2009.03.014zbMath1175.90016OpenAlexW2039704104MaRDI QIDQ1037696

Yuan-Shyi Peter Chiu, Chia-Kuan Ting

Publication date: 16 November 2009

Published in: European Journal of Operational Research (Search for Journal in Brave)

Full work available at URL: https://doi.org/10.1016/j.ejor.2009.03.014


zbMATH Keywords

manufacturingproductionreworkmachine breakdowndefective item


Mathematics Subject Classification ID

Reliability, availability, maintenance, inspection in operations research (90B25) Production models (90B30) Inventory, storage, reservoirs (90B05)


Related Items (3)

A production inventory supply chain model with partial backordering and disruption under triangular linguistic dense fuzzy lock set approach ⋮ An EPQ model with inflation in an imperfect production system ⋮ Pricing and production decisions in multi-product single machine manufacturing system with discrete delivery and rework




Cites Work

  • Unnamed Item
  • Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns




This page was built for publication: A note on ``Determining the optimal run time for EPQ model with scrap, rework, and stochastic breakdowns

Retrieved from "https://portal.mardi4nfdi.de/w/index.php?title=Publication:1037696&oldid=13041142"
Tools
What links here
Related changes
Special pages
Printable version
Permanent link
Page information
MaRDI portal item
This page was last edited on 30 January 2024, at 22:36.
Privacy policy
About MaRDI portal
Disclaimers
Imprint
Powered by MediaWiki