Scheduling three chains on two parallel machines
From MaRDI portal
Publication:1040986
DOI10.1016/j.ejor.2009.07.001zbMath1176.90191OpenAlexW1967183464MaRDI QIDQ1040986
Andrea Pacifici, Marta Flamini, Alessandro Agnetis, Gaia Nicosia
Publication date: 27 November 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2009.07.001
Abstract computational complexity for mathematical programming problems (90C60) Deterministic scheduling theory in operations research (90B35)
Related Items (5)
Parallel dedicated machines scheduling with chain precedence constraints ⋮ A job-shop problem with one additional resource type ⋮ Scheduling on parallel machines with preemption and transportation delays ⋮ A best possible online algorithm for scheduling equal-length jobs on two machines with chain precedence constraints ⋮ Online scheduling with chain precedence constraints of equal-length jobs on parallel machines to minimize makespan
Cites Work
- Unnamed Item
- Heuristics for unrelated machine scheduling with precedence constraints
- Scheduling chain-structured tasks to minimize makespan and mean flow time
- On the complexity of non-preemptive shop scheduling with two jobs
- Two machine preemptive scheduling problem with release dates, equal processing times and precedence constraints
- Fast Approximation Algorithms for the Knapsack and Sum of Subset Problems
- Complexity of Scheduling under Precedence Constraints
- Parallel Processing and Applied Mathematics
This page was built for publication: Scheduling three chains on two parallel machines