Simultaneously scheduling multiple turns for steel color-coating production
From MaRDI portal
Publication:1042046
DOI10.1016/j.ejor.2008.09.025zbMath1176.90431OpenAlexW1999526948MaRDI QIDQ1042046
Publication date: 7 December 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2008.09.025
Uses Software
Cites Work
- The vehicle routing problem: An overview of exact and approximate algorithms
- A multiple traveling salesman problem model for hot rolling scheduling in Shanghai Baoshan Iron \& Steel Complex
- The hot strip mill production scheduling problem: A tabu search approach
- Tabu Search—Part I
- Tabu Search—Part II
- Simple Heuristics for the Vehicle Routeing Problem with Soft Time Windows
- A review of planning and scheduling systems and methods for integrated steel production
This page was built for publication: Simultaneously scheduling multiple turns for steel color-coating production