Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots
From MaRDI portal
Publication:1042101
DOI10.1016/J.EJOR.2008.10.035zbMath1176.90201DBLPjournals/eor/CheC09OpenAlexW2033538145WikidataQ57185757 ScholiaQ57185757MaRDI QIDQ1042101
Publication date: 7 December 2009
Published in: European Journal of Operational Research (Search for Journal in Brave)
Full work available at URL: https://doi.org/10.1016/j.ejor.2008.10.035
Related Items (8)
Mixed-integer linear programming method for multi-degree and multi-hoist cyclic scheduling with time windows ⋮ A branch and bound algorithm for the cyclic job-shop problem with transportation ⋮ Multi-degree cyclic flow shop robotic cell scheduling problem: ant colony optimization ⋮ A faster algorithm for 2-cyclic robotic scheduling with a fixed robot route and interval processing times ⋮ A polynomial algorithm for multi-robot 2-cyclic scheduling in a no-wait robotic cell ⋮ Cyclic flowshop scheduling with operators and robots: Vyacheslav Tanaev's vision and lasting contributions ⋮ A survey of scheduling problems with no-wait in process ⋮ On the existence of dominating 6-cyclic schedules in four-machine robotic cells
Cites Work
- Approximation algorithms for \(k\)-unit cyclic solutions in robotic cells
- Scheduling dual gripper robotic cell: one-unit cycles
- Cyclic multiple-robot scheduling with time-window constraints using a critical path approach
- Sequencing and scheduling in robotic cells: recent developments
- Optimal scheduling of material handling devices in a PCB production line: problem formulation and a polynomial algorithm
- Minimal quantity of operators for serving a homogeneous linear technological process
- An improved algorithm for cyclic flowshop scheduling in a robotic cell
- Minimizing the fleet size with dependent time-window and single-track constraints
- Cyclic scheduling in a robotic production line
- Minimizing the number of robots to meet a given cyclic schedule
- No-wait flow shop scheduling with large lot sizes
- Scheduling no-wait robotic cells with two and three machines
- Cyclic scheduling in robotic flowshops
- A polynomial algorithm for no-wait cyclic hoist scheduling in an extended electroplating line
- An exact optimal cyclic scheduling algorithm for multioperator service of a production line
- Throughput optimization in robotic cells
- Cyclic hoist scheduling in large real-life electroplating lines
- Resolution Of The Cyclic Multi-Hoists Scheduling Problem With Overlapping Partitions
- Cyclic Scheduling of Identical Parts in a Robotic Cell
- Optimal Cyclic Multi-Hoist Scheduling: A Mixed Integer Programming Approach
- An Efficient Optimal Solution to the Two-Hoist No-Wait Cyclic Scheduling Problem
- A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
- Part sequencing in three-machine no-wait robotic cells
This page was built for publication: Multi-degree cyclic scheduling of a no-wait robotic cell with multiple robots